The following projects are completed, under-construction or in design/scheduled. For further information you can CALL or EMAIL us at 717-665-2461/ e-mail: Manheim Boro Authority |
|
|
Wastewater Plant Biological Nutrient Reduction Upgrade |
|
|
Wastewater Plant upgrade to reduce Total Nitrogen and Phosphates to meet the Chesapeake Bay Tributary regulations. |
Cost: $11,000,000.00
Authority Funds; $6,700,000.00
Grants; $4,300,000.00 |
|
|
|
|
|
Replacement of all Residential water meter and install AMR radio meter reading technology |
|
|
|
|
Penn DOT SR0072-024 Five Points Project |
|
|
Replace and Install 1400 ft of new water lines, repair 330 ft of sanitary sewer pipe. Replacement of valves and install new hydrants. |
Cost: $450,000.00
Authority Funds; $225,000.00
Penn DOT;$225,000.00 |
|
|
Penn DOT SR0072-038 South Main Street |
|
|
Replace and Install sections of water main, repair and replace manhole lids and frames. Replacement of valves and install new hydrants. |
Cost:$55,000.00
Authority Funds;$55,000.00
Penn DOT;$3,600.00 |
|
|
Manheim Borough Authority Rettew Lane Bridge Replacement |
Project start Spring 2012 completion fall 2012 |
Relocation and replacement of the Rettew Lane Bridge |
Cost: $ 1,200,000.00
Authority Funds: 100% |
|
|
|